Saturday, April 2, 2011

flowers blooming in tokyo!

Life might not be exactly relaxing as the usual in Tokyo, flowers are blooming as a matter of course.

Cherry blossoms, will soon be colouring the city.

Beautiful season in Tokyo.

YUSURA
BOKE

SAKURA cherry blossom

Wednesday, March 30, 2011

Water radioactive material level: None detected

Data on March 30th shows that the radioactive material amount has now decreased to undetectable level. 

Tuesday, March 29, 2011

Water radioactive info in Tokyo Mar 29


Water radioactive material level:
Mar. 28 -level low enough to call off alert. Low enough to say safe even for
new-born babies.

Up-to-date info on measured radioactive material level in purification
plants in Tokyo by Tokyo Metro Gov't
source:
[http://www.waterworks.metro.tokyo.jp/press/shinsai22/press110324-02-1.pdf]
measured in Bq/Kg
[March 28, 2011]
KANAMACHI(金町) [I-131:ND] [Ce-134:ND][Ce-137:ND]
ASAGIRI(朝霧)[I-131:ND] [Ce-134:ND][Ce-137:ND]
OZAKU(小作)[I-131:ND] [Ce-134:ND][Ce-137:ND]

(ND:not detected)

[tap water:shinjuku]
measured in Bq/Kg
2011/03/27 [I-131:19.7] [Ce-134:0.47]  [Ce-137:0.72]

data from Tokyo Metro Gov't Institute of Public Health
http://ftp.jaist.ac.jp/pub/emergency/monitoring.tokyo-eiken.go.jp/monitoring/w-past_data.html

Sunday, March 27, 2011

Water radioactive info in Tokyo Mar 26

Water radioactive material level:
Mar. 26 -level low enough to call off alert. Low enough to say safe even for
new-born babies.

Up-to-date info on measured radioactive material level in purification
plants in Tokyo by Tokyo Metro Gov't
source:
[http://www.waterworks.metro.tokyo.jp/press/shinsai22/index.html]
measured in Bq/Kg
[March 26, 2011]
KANAMACHI(金町) [I-131:34] [Ce-134:ND][Ce-137:ND]
ASAGIRI(朝霧)[I-131:48] [Ce-134:ND][Ce-137:ND]
OZAKU(小作)[I-131:ND] [Ce-134:ND][Ce-137:ND]

(ND:not detected)

[tap water:shinjuku]
measured in Bq/Kg
2011/03/25 [I-131:31.8] [Ce-134:0.92]  [Ce-137:1.22]

2011/03/26 [I-131:37.2] [Ce-134:0.78]  [Ce-137:1.01]

data from Tokyo Metro Gov't Institute of Public Health
http://ftp.jaist.ac.jp/pub/emergency/monitoring.tokyo-eiken.go.jp/monitoring/w-past_data.html

Friday, March 25, 2011

Water radioactive info in Tokyo Mar 25

Water radioactive material level:
Mar. 25 -level low enough to call off alert. Low enough to say safe even for
new-born babies.

Up-to-date info on measured radioactive material level in purification
plants in Tokyo by Tokyo Metro Gov't
source:
[http://www.waterworks.metro.tokyo.jp/press/shinsai22/index.html]
measured in Bq/Kg
[March 25, 2011]
KANAMACHI(金町) [I-131:51] [Ce-134:ND][Ce-137:ND]
ASAGIRI(朝霧)[I-131:76] [Ce-134:ND][Ce-137:ND]
OZAKU(小作)[I-131:ND] [Ce-134:ND][Ce-137:ND]

(ND:not detected)

[tap water:shinjuku]
measured in Bq/Kg
2011/03/24 [I-131:25.6] [Ce-134:1.01]  [Ce-137:1.43]

data from Tokyo Metro Gov't Institute of Public Health
http://ftp.jaist.ac.jp/pub/emergency/monitoring.tokyo-eiken.go.jp/monitoring/w-past_data.html

Monday, March 14, 2011

Planned Blackout Schedule:


※これは東京電力管轄内で予定されている計画停電のスケジュール情報を外国人の方向けに
翻訳しているページです。日本語が読めなくて困っている外国人の方をご存知でしたら教えてあげてください。
source:http://five-wits.jp/midoryza/?p=844

A big earthquake occurred in the northern part of Japan at 2:46PM of March 11th 2011. Because TEPCO’s facilities have been seriously damaged, power shortage is expected. TEPCO announced on March 13th that the rolling blackouts is necessary to restore the electric power for Kanto and Tohoku area.
TEPCO = Tokyo Electric Power Company / Tokyo Denryoku
Last Update: March 14 21:33
Please check which Group your area belongs to by looking for your address in the following PDF file.
*Your address may belongs to 2 groups. It is better to prepare for both groups.
**Original data we used is released by TEPCO on March 13th 21:00.
The planned blackout schedule for Tuesday, March 15th.
Group 1: (15:20-19:00)
Group 2: (18:20-22:00)
Group 3: (6:20-10:00)
Group 4: (9:20-13:00)
Group 5: (12:20-16:00)
*About 3 hours of blackout may occur during the period above.
*Start and End time may be outside of the schedule above.
*Unexpected blackouts may occur outside of the schedule above.
*If you can’t find your address here, your area may be exempt from this rolling blackouts, or waiting to be added.
*TEPCO is keep updating the information, so it is always better to check with their latest information from their website. (only in Japanese now)
TEPCO official website (Japanese)
http://www.tepco.co.jp/index-j.html
*We try to update with the latest annoucement, but please refer to the TEPCO web-site for the accurate and latest information.
*This translation is provided by volunteers. Please refer to the TEPCO web-site for the accurate and latest information.

Sunday, March 13, 2011

the Earthquake in Japan

Images on TV are devastating.
There are still people without lifelines,
without shelters, waiting to be rescued.

All I can do is wait and pray for those to be rescued,
pray for people to stay strong.

Hearing that people are sharing and in order at the
shelters at least relieve a part of the tension in my heart.

Japan is strong.
But we do need help.
I still do not exactly what,
but when I know, I will let you know.

Even the thoughts, help.

All I can do is wait.
Till the time to act.